Mains leads configuration
Posted by: Bosh on 21 June 2001
The new house has a 6mm2 dedicated spur (star earthed)now installed with 3 unswitched double sockets.
I gather Naim advise 2 leads into 1 plug. How should I arrange these for a 52/SC/SNAXO /SC/4x135/NAT02/ LP12/Arma/Prefix/HC/Nakamichi (11 mains leads) system for best effect?