Plugging sequence

Posted by: pz on 09 January 2016

Hi,

Currently I have 10 mm dedicated mains spur just one wall socket installed at the wire's end. Also have Wrewold Matrix 2 distribution block for the plugs of my boxes. My mains powered boxes as follows:

PS555DR (for NDS)

SCDR (for 282)

NAPSC (for 282)

CD5XS

NAP250

In what sequence should I insert these plugs into the distribution block for optimum performance?

 

Thxs in advance.

 

 

Posted on: 09 January 2016 by Erik

In that order but the NAPSC last.