Plugging sequence
Posted by: pz on 09 January 2016
Hi,
Currently I have 10 mm dedicated mains spur just one wall socket installed at the wire's end. Also have Wrewold Matrix 2 distribution block for the plugs of my boxes. My mains powered boxes as follows:
PS555DR (for NDS)
SCDR (for 282)
NAPSC (for 282)
CD5XS
NAP250
In what sequence should I insert these plugs into the distribution block for optimum performance?
Thxs in advance.